Skip to content

Trenchless sewer repair specialists · Serving Denver, CO

Free estimates(888)-697-2066

Call now · free estimates(888)-697-2066
Free Estimate

CIPP pipe lining in Denver

Cured-in-place pipe is a new pipe built inside the old one. This is the whole process in order, with the checkpoints a homeowner in Denver should expect to see along the way.

Call (888)-697-2066 Get a free estimate

Estimates are free. Call now.

  • No DigTrenchless repair
  • 1 DayTypical install
  • 50 YrRated liner life
  • FreeEstimates

What CIPP pipe lining does

CIPP pipe lining in Denver rebuilds a sewer from the inside. A flexible tube of felt or fiberglass, saturated with a thermosetting resin, is placed inside the existing pipe, pressed against its wall, and hardened into a rigid, jointless pipe that follows the old one exactly. The host pipe supplies the shape; the cured liner supplies the strength. The method is governed by ASTM F1216 for inversion installs and ASTM F1743 for pulled-in liners, and those standards describe most of what follows. A good crew works through the steps in a fixed order, and each step leaves something you can see or ask for.

Step one: cleaning and inspection

The line is jetted with high-pressure water to strip grease, scale, roots and sediment, then filmed with a push camera or crawler. Cast iron may need a chain flail or descaling head to knock heavy tuberculation off the wall. The pre-lining video is the record the whole job is planned from: it confirms the pipe material, the diameter, the position of every branch connection, and whether any defect is beyond what a liner can bridge. Ask for a copy of this video. If a section has collapsed or a joint is badly dropped, it is repaired or replaced before lining, not lined over.

Step two: measuring and preparing the liner

Length is measured on the camera footage counter from the access point to the termination, and diameter is confirmed on the video or with a gauge. The liner tube is cut to length with an allowance at each end, and its wall thickness is selected for the pipe diameter, depth and groundwater conditions; a four-inch lateral typically takes a thinner liner than an eight-inch main. A description of what a CIPP liner is made of covers the tube and resin options in more depth, but the common pairings are a felt tube with epoxy or vinyl-ester resin for laterals and a fiberglass tube with a UV-curable resin where speed and a thin wall matter.

Step three: wet-out

Wet-out is the saturation of the tube with resin. Resin and hardener are mixed in measured ratio, poured into the tube, and worked through it with rollers or a vacuum so that every fiber is coated and no dry spots or air pockets remain. On a residential job this happens in the truck or on a table in the yard just before installation, because the resin begins to react as soon as it is mixed. Fiberglass UV liners arrive from the factory already impregnated and stored away from light, so this step is skipped on site.

Resin ratio and working time are the two things that go wrong quietly. Too little hardener and the liner never fully cures; too long between mixing and inversion and the resin stiffens before the tube is in place. Neither is visible on the surface afterward. A crew that logs the batch, the mix and the clock is doing what the standards ask.

Step four: inversion or pull-in

  • Inversion turns the tube inside out as it travels. One end is fixed to an inversion drum or a standpipe at the cleanout, and air or water pressure pushes the tube down the pipe, unrolling it so the resin side ends up against the host wall and the smooth coated side faces the flow. Inversion needs access at only one end.
  • Pull-in draws the saturated tube through the pipe on a winch line from one access to another, then inflates a bladder or calibration hose inside it to press it outward. It suits short runs, sectional repairs and situations where the far end is already open.

Either way the liner is held under pressure against the wall until cure is complete, so that it takes the exact shape of the host pipe including any mild bends.

Step five: curing

The resin is hardened by heat or light. Hot water is circulated through the inflated liner for several hours; steam does the same faster and is now the usual choice on laterals; UV light trains are pulled slowly through a fiberglass liner and cure it in minutes per length. Temperature is monitored at the liner ends during a heat cure, and the crew holds the pressure until the resin has hardened through its full thickness, then cools it gradually to avoid stress. Rushing this stage is the most common cause of a liner that later shows soft spots or lifts from the wall.

Step six: reinstating laterals and finishing ends

A full-length liner covers every branch connection it passes. A robotic cutter, guided by a camera and the positions recorded on the pre-lining video, is sent into the pipe to cut each connection open again, matching the branch opening as closely as possible. The liner ends are trimmed flush at the cleanout and at the main or termination point, and where the liner terminates inside the main a lateral hat or end seal may be fitted. cured-in-place sewer lining in Denver normally includes this step in the scope; a quote that does not mention reinstatement has left out a real part of the work.

Step seven: the post-lining video in Denver

The finished pipe is filmed end to end. You should see a smooth, uniform wall with no wrinkles that would trap debris, no soft or unbonded areas, each branch connection opened cleanly, and the ends finished. This video, alongside the pre-lining one, is the documentation of the job and the basis of any warranty. Many municipalities, including those serving Denver, require an inspection or a copy of the footage before closing the permit. verified CIPP installers serving Denver lists installers who provide both videos as a matter of course, which is the simplest test of whether a crew follows the process described here.

Common questions in Denver

How long does CIPP pipe lining in Denver take?

Most residential laterals are cleaned, lined, cured and reinstated in a single day, with steam cure shortening the schedule and hot water lengthening it. Sewer service is interrupted while the liner is in and curing.

What is the liner made of?

A felt or fiberglass tube saturated with epoxy or vinyl-ester resin. Felt with epoxy is the common choice for house laterals; fiberglass with a UV-curable resin is used where a thin wall and a fast cure are wanted.

Does the liner need access at both ends?

Not for inversion, which works from a single cleanout. Pull-in installation needs access at both ends but suits short runs and sectional repairs.

What happens to the branch connections that the liner covers?

A robotic cutter reopens each one from inside the pipe after cure, guided by the positions recorded on the pre-lining video. Reinstatement should be listed in the scope.

How long does a cured-in-place liner last?

Manufacturers and the trade design liners to a fifty-year service life, based on the resin systems and testing behind the ASTM standards. That is a design figure rather than a guarantee, and it assumes the liner was fully cured and bonded.

Ready to fix that sewer line without digging?

Free estimates in Denver. Most jobs done in one day.

Call (888)-697-2066

Estimates are free. Call now.

Call NOW! (888)-697-2066

Estimates are free. Call now.